Boya mağazasıPony Luxury Coating
Pony L11000 (11x5x5)
Boya mağazası
Pony Luxury Coating
Pony L11000 (11x5x5)
Sabit fiyat KDV hariç
€81.250
Üretim yılı
2025
Durum
Yeni
(tamamen fonksiyonel)
Konum
Würzburg 

Makineye ait bilgiler
- Makine adı:
- Boya mağazası
- Üretici:
- Pony Luxury Coating
- Model:
- Pony L11000 (11x5x5)
- Üretim yılı:
- 2025
- Durum:
- yeni
- Işlevsellik:
- tamamen fonksiyonel
Fiyat ve Konum
Sabit fiyat KDV hariç
€81.250
- Konum:
- Schulstr 3, 97084 Würzburg, Deutschland

Ara
Teknik detaylar
- Toplam yükseklik:
- 5.600 mm
- Toplam uzunluk:
- 11.200 mm
- Toplam genişlik:
- 5.100 mm
- Giriş akımı türü:
- trifaze
- Garanti süresi:
- 24 aylar
- Iç yükseklik:
- 4.970 mm
- Iç uzunluk:
- 11.000 mm
- Sıcaklık:
- 80 °C
- Iç genişlik:
- 5.000 mm
- Hava ihtiyacı:
- 52.000 m³/saat
- Giriş voltajı:
- 380 V
- Isıtma kapasitesi:
- 250 kW (339,91 bg)
- Güç:
- 45 kW (61,18 bg)
- Yakıt:
- sıvılaştırılmış petrol gazı (LPG)
- Giriş frekansı:
- 50 Hz
- Enerji tüketimi:
- 45 kWh
- Izolasyon kalınlığı:
- 50 mm
- Nominal güç:
- 250 kW (339,91 bg)
- Maks. sac kalınlığı çelik:
- 2 mm
- Donanım:
- aydınlatma
Teklif detayları
- İlan Kimliği:
- A19572531
- Son güncelleme tarihi:
- 15.01.2026
Açıklama
* Air Treatment Unit:
The air treatment unit is a recirculation system that supplies the cabin with filtered fresh air while extracting used air during the painting process. It heats the air to 60°C, mixes 10% fresh air with the extracted air via an automatic multi-damper system, and reheats the air before it is returned to the cabin. The air is heated by a burner and a heat exchanger, both made of high-quality 304 stainless steel and located within the fresh air unit. During painting, the air is filtered twice (by front and ceiling filters) before entering the cabin. The contaminated air is also filtered twice (by intake and exhaust filters) before exiting through the exhaust unit. Air treatment units are insulated like the side panels to minimize heat loss and are protected from potential vibrations and noise by rubber seals on the covers. The exhaust air is regulated by a flap in the air outlet duct, helping to control the internal pressure of the cabin.
*OPERATING PRINCIPLES OF THE CABIN:
Processes in the cabin are controlled via a control panel, which manages the following steps:
*PAINTING PROCESS:
During painting, 100% fresh air is drawn in from outside and routed through front filters before reaching the distribution chamber at ambient temperature. The air is then expelled through the extraction unit. Floor filters (overspray arrestors) capture paint particles, and the air passes through final exhaust filters before being discharged.
*FLASH-OFF PROCESS:
After painting, the cabin continues to operate for approximately 15 minutes to remove residual solvents and thinners. During this phase, fresh air from outside circulates through the cabin.
*DRYING PROCESS:
In this phase, 80% of the air circulating through the cabin is heated to 60°C and directed into the cabin via a distributor. As 20% of the solvents are released during drying, these are expelled with the air. Industrial paints are typically dried at 60°C, but the cabin temperature can be adjusted via the control panel as needed.
*COOLING PROCESS:
After the 30-minute drying process, the coil is deactivated through the control panel, the pneumatic flap closes, and the extraction unit starts again. During the 5-minute cooling phase, fresh air from outside circulates through the cabin, after which the system stops automatically.
ELECTRICAL AND ELECTRONIC EQUIPMENT:
These control cabinets manage the functions and operation of all machines and devices integrated into the cabin. The control panel is constructed from durable galvanized sheet and steel profiles and is fully enclosed to protect against dust and moisture.
Electrical equipment and control panel:
• The control panel contains essential components such as circuit breakers, fuses, signal lamps, thermal relays, contactors, and connectors.
• Heat-resistant cables are used for command and control connections between the control panel and motors or other electrical devices.
Nsdpowzl Hxsfx Ac Asda
• Electrical wiring is designed to allow for cabin relocation when needed.
• Operating equipment runs on 380 V 50 Hz, while control devices operate on 220 V.
Bu ilan otomatik olarak tercüme edildiğinden bazı çeviri hataları oluşmuş olabilir.
The air treatment unit is a recirculation system that supplies the cabin with filtered fresh air while extracting used air during the painting process. It heats the air to 60°C, mixes 10% fresh air with the extracted air via an automatic multi-damper system, and reheats the air before it is returned to the cabin. The air is heated by a burner and a heat exchanger, both made of high-quality 304 stainless steel and located within the fresh air unit. During painting, the air is filtered twice (by front and ceiling filters) before entering the cabin. The contaminated air is also filtered twice (by intake and exhaust filters) before exiting through the exhaust unit. Air treatment units are insulated like the side panels to minimize heat loss and are protected from potential vibrations and noise by rubber seals on the covers. The exhaust air is regulated by a flap in the air outlet duct, helping to control the internal pressure of the cabin.
*OPERATING PRINCIPLES OF THE CABIN:
Processes in the cabin are controlled via a control panel, which manages the following steps:
*PAINTING PROCESS:
During painting, 100% fresh air is drawn in from outside and routed through front filters before reaching the distribution chamber at ambient temperature. The air is then expelled through the extraction unit. Floor filters (overspray arrestors) capture paint particles, and the air passes through final exhaust filters before being discharged.
*FLASH-OFF PROCESS:
After painting, the cabin continues to operate for approximately 15 minutes to remove residual solvents and thinners. During this phase, fresh air from outside circulates through the cabin.
*DRYING PROCESS:
In this phase, 80% of the air circulating through the cabin is heated to 60°C and directed into the cabin via a distributor. As 20% of the solvents are released during drying, these are expelled with the air. Industrial paints are typically dried at 60°C, but the cabin temperature can be adjusted via the control panel as needed.
*COOLING PROCESS:
After the 30-minute drying process, the coil is deactivated through the control panel, the pneumatic flap closes, and the extraction unit starts again. During the 5-minute cooling phase, fresh air from outside circulates through the cabin, after which the system stops automatically.
ELECTRICAL AND ELECTRONIC EQUIPMENT:
These control cabinets manage the functions and operation of all machines and devices integrated into the cabin. The control panel is constructed from durable galvanized sheet and steel profiles and is fully enclosed to protect against dust and moisture.
Electrical equipment and control panel:
• The control panel contains essential components such as circuit breakers, fuses, signal lamps, thermal relays, contactors, and connectors.
• Heat-resistant cables are used for command and control connections between the control panel and motors or other electrical devices.
Nsdpowzl Hxsfx Ac Asda
• Electrical wiring is designed to allow for cabin relocation when needed.
• Operating equipment runs on 380 V 50 Hz, while control devices operate on 220 V.
Bu ilan otomatik olarak tercüme edildiğinden bazı çeviri hataları oluşmuş olabilir.
Belgeler
Tedarikçi
Not: Ücretsiz kaydolun veya giriş yapın, tüm bilgilere erişmek için.
Kayıtlı seit: 2025
8 çevrimiçi ilan
İstek gönder
Telefon & Faks
+49 931 4... ilanlar
Bu ilanlar da ilginizi çekebilir.
Küçük ilan
Enschede
2.633 km
Yuvarlak bükme makinesi
OSTAS4R OHS 2070 x 220
OSTAS4R OHS 2070 x 220
Küçük ilan
Büyükkayacık OSB
255 km
Düşük yükleyici
GVN Trailer3 Axle Tramex Platform Lowbed
GVN Trailer3 Axle Tramex Platform Lowbed
Küçük ilan
Parma
2.155 km
Alçak yükleyici inşaat makineleri
CEYLAN carrellone rampe idrauliche nuovo
CEYLAN carrellone rampe idrauliche nuovo
Küçük ilan
Petershagen
2.512 km
Alçak şasi dorse
Gabelstapler/Arbeitsbühnentransporter Klapprampe
Gabelstapler/Arbeitsbühnentransporter Klapprampe
Küçük ilan
Finlandiya
2.637 km
Kumlama ünitesi
Gietart
Gietart
Küçük ilan
Würzburg
2.325 km
Boya mağazası
Pony Luxury Coating M&KPony 7000
Pony Luxury Coating M&KPony 7000
Küçük ilan
Avižieniai
1.914 km
Boya bitirme sistemi
Wagner
Wagner
Küçük ilan
Büyükkayacık OSB
253 km
Yarı römork taşıyan araba
LiderTruck Carrier 1
LiderTruck Carrier 1
Küçük ilan
Metzingen
2.328 km
Freze makinesi - evrensel
GELDMACHERUWF 405
GELDMACHERUWF 405
Küçük ilan
Bitburg
2.566 km
Püskürtme Masası/ Boyama Masası
RehnenLacky
RehnenLacky
İlanınız başarıyla silindi
Bir hata oluştu
























































































































